Projects Under Control

Decisions, coordination, and execution governed from the owner's side.

Government Office
Construction Management

Government Office

Independent quality and compliance verification imposed across contractor and subcontractor tiers.

Confidential · Phnom Penh, Cambodia

Structured oversight across quality, compliance, and coordination during a multiyear government office project, maintaining progress through language barriers and Covid-19 disruptions.

Read case study →
Show DC
Project Management

Show DC

Decision flow centralized across 20+ packages and 8 design firms under owner-side coordination.

Show DC Corp., Ltd. · Bangkok, Thailand

End-to-end project leadership for a 156,000 sqm retail and entertainment destination, coordinating 20+ construction packages and 8 design firms.

Read case study →
Sovannaphum SEZ
Quantity Surveying

Sovannaphum SEZ

Cost verification and reporting discipline imposed across 25 contractor packages.

Confidential · Kandal Province, Cambodia

Post-award QS and contract administration for 25 packages across a 204-hectare economic zone, with digital dashboards and transparent cost control.

Read case study →
Dhanarak DADC
BIM Modeling

Dhanarak DADC

Coordination structure enforced through BIM across all design disciplines before construction.

Dhanarak Asset Development Co., Ltd. · Bangkok, Thailand

Advanced BIM and Digital Twin framework for a 600,000+ sqm convention and office complex, enabling precise coordination and verified digital asset handover.

Read case study →
DHL Thepharak
Structural Design

DHL Thepharak

Structural constraints formalized across foundation, span, and construction sequence before site mobilization.

DHL Thailand · Samut Prakan, Thailand

Hybrid RC–steel structural system for a high-efficiency logistics facility, balancing foundation stability, long-span needs, and accelerated construction.

Read case study →
DOA Future Lab
MEP Design

DOA Future Lab

Continuity requirements imposed across MEP systems to enforce operation under flood and utility failure.

Department of Agricultural Affairs · Bangkok, Thailand

Integrated civil, sanitary, HVAC, and digital resilience strategy for a national research facility, ensuring 24/7 continuity under flood and utility failure scenarios.

Read case study →

Start with a project review

Tell us about your project. We respond with a structured approach.

We’ll never share your email. By submitting, you agree to be contacted about your project.

WhatsAppTelegramFacebookLinkedIn